Two more new lifts at JFBB
6 posts
4 users
942 views
Thefirewarde
5 months ago (edited 5 months ago)
Member since 09/17/2015 🔗
77 posts

https://www.facebook.com/skiJFBB/photos/a.231659675445/10159532403660446/?type=3&app=fbl Facebook post

Four doubles come down, two quad lifts go up.

Scott - DCSki Editor
5 months ago
Member since 10/10/1999 🔗
1,185 posts

Also see this DCSki story: https://www.dcski.com/articles/1656

Thefirewarde
5 months ago
Member since 09/17/2015 🔗
77 posts

At Jack Frost, B and C lift, E and F lift, and now also East 1 and 2 double lifts are being replaced by fixed grip quads.

At Big Boulder, the Edielweiss triple and now also Merry Widow 1 and 2 lifts are being replaced by new fixed grip quads.

Five new lifts across JFBB is a pretty significant investment and cuts the required staff for full operations by four whole lift crews.

abeski
5 months ago (edited 5 months ago)
Member since 12/8/2021 🔗
20 posts
2 doubles have greater uphill capacity than 1 quad (faster line speed, closer chair spacing, less misloads, redundancy, easier to load chairs to capacity) but having newer equipment is also nice
ZARDOG
5 months ago
Member since 10/25/2020 🔗
105 posts

it is about staff reduction first. No staff no lifts run. They needed the new lifts. 

Thefirewarde
5 months ago
Member since 09/17/2015 🔗
77 posts

Half the maintenance, half the lifties, new equipment - it all adds up. There's a reason just about nobody is building new doubles these days.

I'm not super familiar with either resort - are they likely to gain any skiable area by freeing up space or no?

DCSki Sponsor: Seven Springs Resort

Ski and Tell

Speak truth to powder.

Join the conversation by logging in.

Don't have an account? Create one here.

0.13 seconds